The construction of the floor on the market can be divided into contractors, contractors do not package materials and buy their own materials to brush several ways.Have detailed construction plan and floor paint construction process, can make the project construction progress smoothly.The selection and purchase of floor materials are directly related to the quality of floor construction. In order to ensure the smooth selection of building materials, we should control the materials well in the selection process.
Guangzhou floor paint
The construction team's mature technology, material storage and transportation, proportion and so on will affect the quality of the floor project.If certain steps are not controlled, it is likely to result in the loss of building materials and the waste of labor costs.For example, the construction of epoxy floor should be carried out at an appropriate temperature. Too high or too low temperature will affect the construction process. If the construction process is not ventilated, the drying speed of the floor paint can not reach the expected level.
In wet weather construction also has the corresponding need to pay attention to the part, the first time to use the material may not be suitable for construction in wet weather, if it is water-based material, also want to avoid construction in too wet weather construction.Due to the different construction personnel, the construction schedule will be affected accordingly. The choice of experienced construction team can reduce the waste of construction time from more details.
Guangzhou floor paint
Floors need to be accepted accordingly and are recommended to be maintained prior to commissioning.Acceptance mainly refers to whether the ground color is unified, whether there is color difference, flatness and other obvious knife edge cracks.In the case of corners and water pipes, the position of the kick rope is more likely to cause problems and defects, so do the appropriate work to accept and accept.
New floors still need some time to repair, usually seven days before they are put into use, to avoid damage to the newly created paint film.Of course, this is not enough, according to the corresponding construction scheme, control the construction of each process, so as to better ensure the quality of the floor project.